The facility interior development of in very short term.
As a base material there were obtained volume of concourse with system of frames placed at low level, designed ventilation system and ready small granite tile on the floor.
We tried to zone space by construction of metal columns and by levels of reflected ceiling of different perforation degree (in hidden space of ceiling there were placed 64 fancoil units) to "transit" zone, shopping zone and waiting zone. The direction of main passenger traffic was marked by white stripe of polymer flooring.